What is the effect of delay in commissioning of power plants?
A.It will lead to increase in the production of energy by already present plants.
B.It will attract MNCS to establish their company.
C.It will cause the rivalry between MNC and Govt. Power plant.
D.When supply doesn’t match demand results in load shedding and breakdown.
Answer
589.2k+ views
Hint: A power plant is an integration of a number of different equipment and system components like boiler, turbine, generator, steam system piping etc. All these equipment’s are tested independently for their performance and installed in the power plant
Complete step by step answer:
- Using both gas and steam turbines, combined-cycle power plants produce higher amounts of electricity from a single fuel source compared to a traditional power plant. They capture heat from the gas turbine to increase power production and are also found to release low amounts of harmful gases into the atmosphere.
- Electricity is produced at an electric power plant. Some fuel sources, such as coal, oil, natural gas, or nuclear energy produce heat. The heat is used to boil water to create steam. The spinning turbine interacts with a system of magnets to produce electricity.
- In few countries, there is a significant delay in commissioning of new power plants that can fill the gap between demand and supply of energy. The result is that old plants come under huge stress to meet the daily demand for power. When supply doesn’t match demand, it results in load shedding and breakdown.
Therefore, the correct answer is option (D).
Note: Commissioning of a power plant is a process where all the components and equipment are first checked for proper installation, then they are checked to see if all the piping is clear for the fluids to flow as designed. Thereafter the systems are pressurised manually to check whether they can sustain the pressures and flow rates at which they are required to perform. The control systems and safety systems are checked for operation and finally the plant is started to see if it performs as designed as a system.
Complete step by step answer:
- Using both gas and steam turbines, combined-cycle power plants produce higher amounts of electricity from a single fuel source compared to a traditional power plant. They capture heat from the gas turbine to increase power production and are also found to release low amounts of harmful gases into the atmosphere.
- Electricity is produced at an electric power plant. Some fuel sources, such as coal, oil, natural gas, or nuclear energy produce heat. The heat is used to boil water to create steam. The spinning turbine interacts with a system of magnets to produce electricity.
- In few countries, there is a significant delay in commissioning of new power plants that can fill the gap between demand and supply of energy. The result is that old plants come under huge stress to meet the daily demand for power. When supply doesn’t match demand, it results in load shedding and breakdown.
Therefore, the correct answer is option (D).
Note: Commissioning of a power plant is a process where all the components and equipment are first checked for proper installation, then they are checked to see if all the piping is clear for the fluids to flow as designed. Thereafter the systems are pressurised manually to check whether they can sustain the pressures and flow rates at which they are required to perform. The control systems and safety systems are checked for operation and finally the plant is started to see if it performs as designed as a system.
Recently Updated Pages
Three beakers labelled as A B and C each containing 25 mL of water were taken A small amount of NaOH anhydrous CuSO4 and NaCl were added to the beakers A B and C respectively It was observed that there was an increase in the temperature of the solutions contained in beakers A and B whereas in case of beaker C the temperature of the solution falls Which one of the following statements isarecorrect i In beakers A and B exothermic process has occurred ii In beakers A and B endothermic process has occurred iii In beaker C exothermic process has occurred iv In beaker C endothermic process has occurred

Master Class 11 Social Science: Engaging Questions & Answers for Success

Master Class 11 Physics: Engaging Questions & Answers for Success

Master Class 11 Maths: Engaging Questions & Answers for Success

Master Class 11 Economics: Engaging Questions & Answers for Success

Master Class 11 Computer Science: Engaging Questions & Answers for Success

Trending doubts
One Metric ton is equal to kg A 10000 B 1000 C 100 class 11 physics CBSE

There are 720 permutations of the digits 1 2 3 4 5 class 11 maths CBSE

State and prove Bernoullis theorem class 11 physics CBSE

Draw a diagram of a plant cell and label at least eight class 11 biology CBSE

Difference Between Prokaryotic Cells and Eukaryotic Cells

1 Quintal is equal to a 110 kg b 10 kg c 100kg d 1000 class 11 physics CBSE