The Serlui B Dam is located in which state?
A) Manipur
B) Mizoram
C) Nagaland
D) Arunachal Pradesh
Answer
466.8k+ views
Hint: Serlui B Dam is made up of three units, each capable of producing 4 MW of electricity. An earthen dam is a name given to the Hydel Project's dam. The dam rises 51.3 metres above the riverbed, is 293 metres long, 8 metres broad at its peak, and 394.2 metres wide at its bottom.
Complete answer:
Serlui B dam, located 12 kilometres from Bilkhawthlir Village in the Kolasib region of Mizoram, is an earth fill and gravity dam on the Serlui river. The dam with the 12 MW hydroelectric power station was built between 2003 and 2009, although there were significant leaks that caused the Hydel Project to be delayed in commissioning.
The Buildium hamlet was inundated during the construction of the Serlui B dam, and they were relocated to Bawktlang village where they were repaired. Bharat Heavy Electricals Limited and Metallurgical Electrical Consultant India Ltd were responsible for the construction of the Serlui B Dam.
Therefore the correct answer is option ‘B’.
Note: Serlui B Dam is also being developed as a pisciculture centre, with tens of thousands of fish being discharged into the reservoir in 2009. For the past five years, Mizoram's state government has received more than 45 lakhs in revenue. The Mizoram Tourism Department has established plans to construct tourist infrastructure because the land near the dam is densely forested, with a 53-kilometre picturesque lake in the midst.
Complete answer:
Serlui B dam, located 12 kilometres from Bilkhawthlir Village in the Kolasib region of Mizoram, is an earth fill and gravity dam on the Serlui river. The dam with the 12 MW hydroelectric power station was built between 2003 and 2009, although there were significant leaks that caused the Hydel Project to be delayed in commissioning.
The Buildium hamlet was inundated during the construction of the Serlui B dam, and they were relocated to Bawktlang village where they were repaired. Bharat Heavy Electricals Limited and Metallurgical Electrical Consultant India Ltd were responsible for the construction of the Serlui B Dam.
Therefore the correct answer is option ‘B’.
Note: Serlui B Dam is also being developed as a pisciculture centre, with tens of thousands of fish being discharged into the reservoir in 2009. For the past five years, Mizoram's state government has received more than 45 lakhs in revenue. The Mizoram Tourism Department has established plans to construct tourist infrastructure because the land near the dam is densely forested, with a 53-kilometre picturesque lake in the midst.
Recently Updated Pages
What happens to glucose which enters nephron along class 10 biology CBSE

Write a dialogue with at least ten utterances between class 10 english CBSE

A circle is inscribed in an equilateral triangle and class 10 maths CBSE

When the JanmiKudian Act was passed that granted the class 10 social science CBSE

A sector containing an angle of 120 circ is cut off class 10 maths CBSE

The sum of digits of a two digit number is 13 If t-class-10-maths-ICSE

Trending doubts
The shortest day of the year in India

Why is there a time difference of about 5 hours between class 10 social science CBSE

Write a letter to the principal requesting him to grant class 10 english CBSE

What is the median of the first 10 natural numbers class 10 maths CBSE

The Equation xxx + 2 is Satisfied when x is Equal to Class 10 Maths

What is the missing number in the sequence 259142027 class 10 maths CBSE