The Serlui B Dam is located in which state?
A) Manipur
B) Mizoram
C) Nagaland
D) Arunachal Pradesh
Answer
460.2k+ views
Hint: Serlui B Dam is made up of three units, each capable of producing 4 MW of electricity. An earthen dam is a name given to the Hydel Project's dam. The dam rises 51.3 metres above the riverbed, is 293 metres long, 8 metres broad at its peak, and 394.2 metres wide at its bottom.
Complete answer:
Serlui B dam, located 12 kilometres from Bilkhawthlir Village in the Kolasib region of Mizoram, is an earth fill and gravity dam on the Serlui river. The dam with the 12 MW hydroelectric power station was built between 2003 and 2009, although there were significant leaks that caused the Hydel Project to be delayed in commissioning.
The Buildium hamlet was inundated during the construction of the Serlui B dam, and they were relocated to Bawktlang village where they were repaired. Bharat Heavy Electricals Limited and Metallurgical Electrical Consultant India Ltd were responsible for the construction of the Serlui B Dam.
Therefore the correct answer is option ‘B’.
Note: Serlui B Dam is also being developed as a pisciculture centre, with tens of thousands of fish being discharged into the reservoir in 2009. For the past five years, Mizoram's state government has received more than 45 lakhs in revenue. The Mizoram Tourism Department has established plans to construct tourist infrastructure because the land near the dam is densely forested, with a 53-kilometre picturesque lake in the midst.
Complete answer:
Serlui B dam, located 12 kilometres from Bilkhawthlir Village in the Kolasib region of Mizoram, is an earth fill and gravity dam on the Serlui river. The dam with the 12 MW hydroelectric power station was built between 2003 and 2009, although there were significant leaks that caused the Hydel Project to be delayed in commissioning.
The Buildium hamlet was inundated during the construction of the Serlui B dam, and they were relocated to Bawktlang village where they were repaired. Bharat Heavy Electricals Limited and Metallurgical Electrical Consultant India Ltd were responsible for the construction of the Serlui B Dam.
Therefore the correct answer is option ‘B’.
Note: Serlui B Dam is also being developed as a pisciculture centre, with tens of thousands of fish being discharged into the reservoir in 2009. For the past five years, Mizoram's state government has received more than 45 lakhs in revenue. The Mizoram Tourism Department has established plans to construct tourist infrastructure because the land near the dam is densely forested, with a 53-kilometre picturesque lake in the midst.
Recently Updated Pages
Which is the Longest Railway Platform in the world?

India Manned Space Mission Launch Target Month and Year 2025 Update

Which of the following pairs is correct?

The Turko-Afghan rule in India lasted for about?

In which state Jews are not considered minors?

What is Ornithophobia?

Trending doubts
Why is there a time difference of about 5 hours between class 10 social science CBSE

The draft of the Preamble of the Indian Constitution class 10 social science CBSE

Write a letter to the principal requesting him to grant class 10 english CBSE

How many members did the Constituent Assembly of India class 10 social science CBSE

Write an application to the principal requesting five class 10 english CBSE

The Constitution of India was adopted on A 26 November class 10 social science CBSE