
The Ranganadi Dam is located in which state ?
(A) Punjab
(B) Arunachal Pradesh
(C) Himachal Pradesh
(D) Jammu & Kashmir
Answer
556.8k+ views
Hint The Ranganadi Dam is a concrete-gravity diversion dam on the Ranganadi River in a state which serves a run-of-the-river scheme. State is also known as the Land of the Rising Sun and ideal for fruit orchards
Complete step by step answer
The Ranganadi dam is located in Arunachal Pradesh. It is a concrete gravity diversion dam on the Ranganadi river which is also known as Panyor river in Arunachal Pradesh. It creates a Ranganadi reservoir. North Eastern Electric Power Corporation (NEEPCO) is the owner of this dam. The dam is meant for electricity functions and is a component of Stage I of the Ranganadi Hydroelectric Project and supports the 405-megawatt Dikrong Power House which has 4 units of 135 MW each.
Additional information
The Ranganadi sub-basin spreads for concerning 2384.65sq.km across the Lower Subansiri and Papum-Pare districts in ArunachalPradesh, and Lakhimpur district of state wherever it joins the Subansiri-Brahmaputra stream system at Khichikagaon. The MDDL (Minimum Drawdown Level) of the dam is at 560m. The minimum drawdown level has been kept at an appropriate height to sustain freshwater supply for the local communities.
So, the correct answer is an option (B)
Note
Ranganadi Dam is the first mega dam of Arunachal Pradesh which isRanganadi Dam constructed on the Ranganadi River, a tributary of Brahmaputra River. The Ranganadi Dam is a gravity dam which is intended for hydroelectric purposes and is a part of stage I of the Ranganadi Hydro-Electric Project. This Project is found within the Lower Subansiri District of the State of Arunachal Pradesh within the Ranganadi basin and therefore the adjacent Dikrong basin.
Complete step by step answer
The Ranganadi dam is located in Arunachal Pradesh. It is a concrete gravity diversion dam on the Ranganadi river which is also known as Panyor river in Arunachal Pradesh. It creates a Ranganadi reservoir. North Eastern Electric Power Corporation (NEEPCO) is the owner of this dam. The dam is meant for electricity functions and is a component of Stage I of the Ranganadi Hydroelectric Project and supports the 405-megawatt Dikrong Power House which has 4 units of 135 MW each.
Additional information
The Ranganadi sub-basin spreads for concerning 2384.65sq.km across the Lower Subansiri and Papum-Pare districts in ArunachalPradesh, and Lakhimpur district of state wherever it joins the Subansiri-Brahmaputra stream system at Khichikagaon. The MDDL (Minimum Drawdown Level) of the dam is at 560m. The minimum drawdown level has been kept at an appropriate height to sustain freshwater supply for the local communities.
So, the correct answer is an option (B)
Note
Ranganadi Dam is the first mega dam of Arunachal Pradesh which isRanganadi Dam constructed on the Ranganadi River, a tributary of Brahmaputra River. The Ranganadi Dam is a gravity dam which is intended for hydroelectric purposes and is a part of stage I of the Ranganadi Hydro-Electric Project. This Project is found within the Lower Subansiri District of the State of Arunachal Pradesh within the Ranganadi basin and therefore the adjacent Dikrong basin.
Recently Updated Pages
Master Class 11 Economics: Engaging Questions & Answers for Success

Master Class 11 English: Engaging Questions & Answers for Success

Master Class 11 Social Science: Engaging Questions & Answers for Success

Master Class 11 Biology: Engaging Questions & Answers for Success

Class 11 Question and Answer - Your Ultimate Solutions Guide

Master Class 11 Business Studies: Engaging Questions & Answers for Success

Trending doubts
10 examples of friction in our daily life

One Metric ton is equal to kg A 10000 B 1000 C 100 class 11 physics CBSE

Difference Between Prokaryotic Cells and Eukaryotic Cells

1 Quintal is equal to a 110 kg b 10 kg c 100kg d 1000 class 11 physics CBSE

Explain zero factorial class 11 maths CBSE

What is a periderm How does periderm formation take class 11 biology CBSE

