On which river, kadana hydroelectric power station in location?
A. Mahi
B. Narmada
C. Tapi
D. Sabarmati
Answer
559.5k+ views
Hint:
Hydroelectricity, or hydroelectric power, is a power created from hydropower. In 2015, hydropower created 16.6% of the world's all out electricity and 70% of all sustainable power and was required to increment by about 3.1% every year for the following 25 years.
Complete answer:
Kadana Dam is an earthen and stonework dam on the Mahi River in the Mahisagar area of Gujarat, India. The dam was developed somewhere in the range of 1979 and 1990. The dams siphoned stockpiling hydroelectric power stations. The initial two generators were dispatched in 1990, the second two every 1998. during low hours, for example, night.
Kadana Hydro Power Station was completed in 1990 on March 31. The electricity limit of this hydropower plant is 240 Megawatt. The introduced limit is additionally 240 Megawatt. The status of this hydropower plant is Operational. The wellspring of water for the working of a hydropower plant is obtained from the Kadana Dam of Mahi River. The Kadana Hydro Power Station is possessed and worked by the Gujarat State Electricity Corporation Limited. The recipient states and Union Territories of this hydropower plant are Gujarat and its neighboring states/association regions. The unit size of this warm force plant is 240 Megawatt (4 units x 60 Megawatt). There are four units inactivity and they are from Unit 1 to Unit 4. All the units of Kadana Hydro Power Station are worked by the BHEL (Bharat Heavy Electricals Limited).
Hence, the correct answer is option A.
Note:
In the first stage, two units (first and second units) are appointed, while in the second stage, two additional units are charged (third and fourth units). The principal unit was appointed in 1990 March 31 with an introduced limit of 60 Megawatt. While the subsequent unit was appointed in 1990 September 02 with an introduced limit of 60 Megawatt. The third unit was dispatched in 1998 on January 03 with an introduced limit of 60 Megawatt. After that, the fourth unit was charged in 1998 May 27 with an introduced limit of 60 Megawatt.
Hydroelectricity, or hydroelectric power, is a power created from hydropower. In 2015, hydropower created 16.6% of the world's all out electricity and 70% of all sustainable power and was required to increment by about 3.1% every year for the following 25 years.
Complete answer:
Kadana Dam is an earthen and stonework dam on the Mahi River in the Mahisagar area of Gujarat, India. The dam was developed somewhere in the range of 1979 and 1990. The dams siphoned stockpiling hydroelectric power stations. The initial two generators were dispatched in 1990, the second two every 1998. during low hours, for example, night.
Kadana Hydro Power Station was completed in 1990 on March 31. The electricity limit of this hydropower plant is 240 Megawatt. The introduced limit is additionally 240 Megawatt. The status of this hydropower plant is Operational. The wellspring of water for the working of a hydropower plant is obtained from the Kadana Dam of Mahi River. The Kadana Hydro Power Station is possessed and worked by the Gujarat State Electricity Corporation Limited. The recipient states and Union Territories of this hydropower plant are Gujarat and its neighboring states/association regions. The unit size of this warm force plant is 240 Megawatt (4 units x 60 Megawatt). There are four units inactivity and they are from Unit 1 to Unit 4. All the units of Kadana Hydro Power Station are worked by the BHEL (Bharat Heavy Electricals Limited).
Hence, the correct answer is option A.
Note:
In the first stage, two units (first and second units) are appointed, while in the second stage, two additional units are charged (third and fourth units). The principal unit was appointed in 1990 March 31 with an introduced limit of 60 Megawatt. While the subsequent unit was appointed in 1990 September 02 with an introduced limit of 60 Megawatt. The third unit was dispatched in 1998 on January 03 with an introduced limit of 60 Megawatt. After that, the fourth unit was charged in 1998 May 27 with an introduced limit of 60 Megawatt.
Recently Updated Pages
Master Class 10 Computer Science: Engaging Questions & Answers for Success

Master Class 10 General Knowledge: Engaging Questions & Answers for Success

Master Class 10 English: Engaging Questions & Answers for Success

Master Class 10 Social Science: Engaging Questions & Answers for Success

Master Class 10 Maths: Engaging Questions & Answers for Success

Master Class 10 Science: Engaging Questions & Answers for Success

Trending doubts
What is the median of the first 10 natural numbers class 10 maths CBSE

Which women's tennis player has 24 Grand Slam singles titles?

Who is the Brand Ambassador of Incredible India?

Why is there a time difference of about 5 hours between class 10 social science CBSE

Write a letter to the principal requesting him to grant class 10 english CBSE

A moving boat is observed from the top of a 150 m high class 10 maths CBSE