Why are railway tracks laid on large size concrete sleepers?
Answer
583.8k+ views
Hint:We know that the pressure applied by train on its track is given as the force applied by train per unit area. We are required to design tracks so that the force due to the train's weight is distributed evenly, due to which pressure can be minimized.
Complete step by step answer:
Railway tracks are subjected to the force due to the train's weight, and this force is to be withstood by concrete sleepers. We know that the force per unit area gives us the total pressure that acts on the body. From the definition of pressure, we can conclude that the larger area gives us a smaller value of pressure, or the lesser area gives us higher pressure. We also know that the force exerted by a train due to its weight is very high, so to transmit it evenly to the ground without rupture of ground, we need sleepers of larger surface area. Earlier railway sleepers were made up of wood, but due to the shortage of its availability and a shorter lifespan, they were replaced by concrete sleepers.
Therefore, we can conclude that to transmit trust due to the train's weight evenly to the ground; we need large-sized concrete sleepers.
Note:The sleeper serves another purpose: it closely intact two rails of a railway track for the train's smooth running. We also use rocks below the sleepers to reduce the penetration of sleepers into the ground.
Complete step by step answer:
Railway tracks are subjected to the force due to the train's weight, and this force is to be withstood by concrete sleepers. We know that the force per unit area gives us the total pressure that acts on the body. From the definition of pressure, we can conclude that the larger area gives us a smaller value of pressure, or the lesser area gives us higher pressure. We also know that the force exerted by a train due to its weight is very high, so to transmit it evenly to the ground without rupture of ground, we need sleepers of larger surface area. Earlier railway sleepers were made up of wood, but due to the shortage of its availability and a shorter lifespan, they were replaced by concrete sleepers.
Therefore, we can conclude that to transmit trust due to the train's weight evenly to the ground; we need large-sized concrete sleepers.
Note:The sleeper serves another purpose: it closely intact two rails of a railway track for the train's smooth running. We also use rocks below the sleepers to reduce the penetration of sleepers into the ground.
Recently Updated Pages
Master Class 10 Computer Science: Engaging Questions & Answers for Success

Master Class 10 General Knowledge: Engaging Questions & Answers for Success

Master Class 10 English: Engaging Questions & Answers for Success

Master Class 10 Social Science: Engaging Questions & Answers for Success

Master Class 10 Maths: Engaging Questions & Answers for Success

Master Class 10 Science: Engaging Questions & Answers for Success

Trending doubts
What is the median of the first 10 natural numbers class 10 maths CBSE

Which women's tennis player has 24 Grand Slam singles titles?

Who is the Brand Ambassador of Incredible India?

Why is there a time difference of about 5 hours between class 10 social science CBSE

Write a letter to the principal requesting him to grant class 10 english CBSE

A moving boat is observed from the top of a 150 m high class 10 maths CBSE