Answer
Verified
373.5k+ views
Hint: It is the NH4 sections from Mumbai to Bangalore, NH7 from Bangalore to Krishnagiri, Tamil Nadu and NH46 from Krishnagiri to nearby Chennai. It passes through Maharashtra, Karnataka, Andhra Pradesh and Tamil Nadu.
Complete Step by Step Answer
It is the largest ongoing project in India. It is the second phase of the National Highways Development Project, and consists of building 7300 kilometers of four- to six-lane routes connecting Srinagar, Kanyakumari, Porbandar and Silchar. Includes NH7 in the North-South corridor. National Highway 4, or NH 4, is the main highway in the Indian state of Andaman and Nicobar Islands. It is 230.7 km long. This road from the capital Port Blair to Diglipur covers all major cities Ferrargunj, Baratang, Kadamtala, Rangat, Billy Ground, Nimbudera, Mayabunder and Diglipur. This highway is known as Andaman Trunk Road (The Great Andaman Trunk Road).
Additional Information ATR has become the lifeblood of the Andaman archipelago, especially those living in the North and Middle Andaman regions. Because before the 1970s to the early 1990s the transport of men and goods that used to take several days by sea route can now be completed in a matter of 10-12 hours. NH-4 is why it facilitates the easy movement of essential goods, health care facilities, etc. All year round.
ATR passes through the disturbed Jarawa Reserve in the middle of Marketing to the Middle Strait where there are laws to limit traveler contact with the Jarawa tribe. Only vehicles with armed passengers are allowed.
The correct answer is option (D) Both A and B.
Note: NH-7 (the old NH-58) links Hindu pilgrimage centers to Rishikesh, Devprayag, Rudraprayag, Karnaprayag, Chamoli, Joshimath and Badrinath and Dehradun and Chandigarh. Pilgrims marching to Sri Hemkunt Sahib take a turn at Govindghat lying on NH-7 between Joshimath and Badrinath. The 7th National Highway traverses the Punjab, Haryana, Himachal Pradesh, and Uttarakhand provinces in India. [2] This national highway is 845 kilometers (525 mi) long.
Complete Step by Step Answer
It is the largest ongoing project in India. It is the second phase of the National Highways Development Project, and consists of building 7300 kilometers of four- to six-lane routes connecting Srinagar, Kanyakumari, Porbandar and Silchar. Includes NH7 in the North-South corridor. National Highway 4, or NH 4, is the main highway in the Indian state of Andaman and Nicobar Islands. It is 230.7 km long. This road from the capital Port Blair to Diglipur covers all major cities Ferrargunj, Baratang, Kadamtala, Rangat, Billy Ground, Nimbudera, Mayabunder and Diglipur. This highway is known as Andaman Trunk Road (The Great Andaman Trunk Road).
Additional Information ATR has become the lifeblood of the Andaman archipelago, especially those living in the North and Middle Andaman regions. Because before the 1970s to the early 1990s the transport of men and goods that used to take several days by sea route can now be completed in a matter of 10-12 hours. NH-4 is why it facilitates the easy movement of essential goods, health care facilities, etc. All year round.
ATR passes through the disturbed Jarawa Reserve in the middle of Marketing to the Middle Strait where there are laws to limit traveler contact with the Jarawa tribe. Only vehicles with armed passengers are allowed.
The correct answer is option (D) Both A and B.
Note: NH-7 (the old NH-58) links Hindu pilgrimage centers to Rishikesh, Devprayag, Rudraprayag, Karnaprayag, Chamoli, Joshimath and Badrinath and Dehradun and Chandigarh. Pilgrims marching to Sri Hemkunt Sahib take a turn at Govindghat lying on NH-7 between Joshimath and Badrinath. The 7th National Highway traverses the Punjab, Haryana, Himachal Pradesh, and Uttarakhand provinces in India. [2] This national highway is 845 kilometers (525 mi) long.
Recently Updated Pages
Three beakers labelled as A B and C each containing 25 mL of water were taken A small amount of NaOH anhydrous CuSO4 and NaCl were added to the beakers A B and C respectively It was observed that there was an increase in the temperature of the solutions contained in beakers A and B whereas in case of beaker C the temperature of the solution falls Which one of the following statements isarecorrect i In beakers A and B exothermic process has occurred ii In beakers A and B endothermic process has occurred iii In beaker C exothermic process has occurred iv In beaker C endothermic process has occurred
The branch of science which deals with nature and natural class 10 physics CBSE
The Equation xxx + 2 is Satisfied when x is Equal to Class 10 Maths
Define absolute refractive index of a medium
Find out what do the algal bloom and redtides sign class 10 biology CBSE
Find the values of other five trigonometric functions class 10 maths CBSE
Trending doubts
Difference between Prokaryotic cell and Eukaryotic class 11 biology CBSE
Fill the blanks with the suitable prepositions 1 The class 9 english CBSE
Two charges are placed at a certain distance apart class 12 physics CBSE
Difference Between Plant Cell and Animal Cell
What organs are located on the left side of your body class 11 biology CBSE
Change the following sentences into negative and interrogative class 10 english CBSE
The planet nearest to earth is A Mercury B Venus C class 6 social science CBSE
The Equation xxx + 2 is Satisfied when x is Equal to Class 10 Maths
What is BLO What is the full form of BLO class 8 social science CBSE