
Nathpa Jhakri hydel power project is located on the river __________.
a. Ganga
b. Brahmputra
c. Sutlej
d. Yamuna
Answer
548.7k+ views
Hint:
Nathpa Jhakri Hydel Project is located in Kinnaur and Shimla District of Himachal Pradesh.
Complete solution:
The Nathpa Jhakri Hydel Power Project began in 1993. It is a 1530 MegaWatt installation in Kinnaur and Shimla of Himachal Pradesh situated on the upper reaches of Sutlej river.
As Himachal Pradeshis extremely rich in hydro resources, this makes the states a great potential for hydroelectric power. For Nathpa Jhakri Project, a 60.5 meters high dam was built and an underground desilting complex. This plant supplies electricity in Himachal Pradesh and Northern Regional Grid states in India. There is a headrace tunnel 27.4km before the dam which is one of the largest in the country.
Originally, it was planned for a construction time of 5 years but there was a need for stabilisation work so the design had to be modified which led to increment in construction time and the project was completed in the year 2004. The distribution of electricity is managed by Northern regional load dispatch centres. The construction cost of the project was 8000 crores. Nathpa Jhakri is the largest and longest headrace tunnel, Desilting chamber, surge shaft and underground power. There is a Francis turbine generator which also is largest known and it also went online in March 2004.
Hence, the correct answer is option C.
Note:
Nathpa Jhakri Hydel plant achieved the highest even power generation of 1191.217 million units of electricity in July 2014.
Nathpa Jhakri Hydel Project is located in Kinnaur and Shimla District of Himachal Pradesh.
Complete solution:
The Nathpa Jhakri Hydel Power Project began in 1993. It is a 1530 MegaWatt installation in Kinnaur and Shimla of Himachal Pradesh situated on the upper reaches of Sutlej river.
As Himachal Pradeshis extremely rich in hydro resources, this makes the states a great potential for hydroelectric power. For Nathpa Jhakri Project, a 60.5 meters high dam was built and an underground desilting complex. This plant supplies electricity in Himachal Pradesh and Northern Regional Grid states in India. There is a headrace tunnel 27.4km before the dam which is one of the largest in the country.
Originally, it was planned for a construction time of 5 years but there was a need for stabilisation work so the design had to be modified which led to increment in construction time and the project was completed in the year 2004. The distribution of electricity is managed by Northern regional load dispatch centres. The construction cost of the project was 8000 crores. Nathpa Jhakri is the largest and longest headrace tunnel, Desilting chamber, surge shaft and underground power. There is a Francis turbine generator which also is largest known and it also went online in March 2004.
Hence, the correct answer is option C.
Note:
Nathpa Jhakri Hydel plant achieved the highest even power generation of 1191.217 million units of electricity in July 2014.
Recently Updated Pages
Two men on either side of the cliff 90m height observe class 10 maths CBSE

What happens to glucose which enters nephron along class 10 biology CBSE

Cutting of the Chinese melon means A The business and class 10 social science CBSE

Write a dialogue with at least ten utterances between class 10 english CBSE

Show an aquatic food chain using the following organisms class 10 biology CBSE

A circle is inscribed in an equilateral triangle and class 10 maths CBSE

Trending doubts
The shortest day of the year in India

Why is there a time difference of about 5 hours between class 10 social science CBSE

Write a letter to the principal requesting him to grant class 10 english CBSE

What is the median of the first 10 natural numbers class 10 maths CBSE

The Equation xxx + 2 is Satisfied when x is Equal to Class 10 Maths

What is the missing number in the sequence 259142027 class 10 maths CBSE

