Nathpa Jhakri hydel power project is located on the river __________.
a. Ganga
b. Brahmputra
c. Sutlej
d. Yamuna
Answer
569.7k+ views
Hint:
Nathpa Jhakri Hydel Project is located in Kinnaur and Shimla District of Himachal Pradesh.
Complete solution:
The Nathpa Jhakri Hydel Power Project began in 1993. It is a 1530 MegaWatt installation in Kinnaur and Shimla of Himachal Pradesh situated on the upper reaches of Sutlej river.
As Himachal Pradeshis extremely rich in hydro resources, this makes the states a great potential for hydroelectric power. For Nathpa Jhakri Project, a 60.5 meters high dam was built and an underground desilting complex. This plant supplies electricity in Himachal Pradesh and Northern Regional Grid states in India. There is a headrace tunnel 27.4km before the dam which is one of the largest in the country.
Originally, it was planned for a construction time of 5 years but there was a need for stabilisation work so the design had to be modified which led to increment in construction time and the project was completed in the year 2004. The distribution of electricity is managed by Northern regional load dispatch centres. The construction cost of the project was 8000 crores. Nathpa Jhakri is the largest and longest headrace tunnel, Desilting chamber, surge shaft and underground power. There is a Francis turbine generator which also is largest known and it also went online in March 2004.
Hence, the correct answer is option C.
Note:
Nathpa Jhakri Hydel plant achieved the highest even power generation of 1191.217 million units of electricity in July 2014.
Nathpa Jhakri Hydel Project is located in Kinnaur and Shimla District of Himachal Pradesh.
Complete solution:
The Nathpa Jhakri Hydel Power Project began in 1993. It is a 1530 MegaWatt installation in Kinnaur and Shimla of Himachal Pradesh situated on the upper reaches of Sutlej river.
As Himachal Pradeshis extremely rich in hydro resources, this makes the states a great potential for hydroelectric power. For Nathpa Jhakri Project, a 60.5 meters high dam was built and an underground desilting complex. This plant supplies electricity in Himachal Pradesh and Northern Regional Grid states in India. There is a headrace tunnel 27.4km before the dam which is one of the largest in the country.
Originally, it was planned for a construction time of 5 years but there was a need for stabilisation work so the design had to be modified which led to increment in construction time and the project was completed in the year 2004. The distribution of electricity is managed by Northern regional load dispatch centres. The construction cost of the project was 8000 crores. Nathpa Jhakri is the largest and longest headrace tunnel, Desilting chamber, surge shaft and underground power. There is a Francis turbine generator which also is largest known and it also went online in March 2004.
Hence, the correct answer is option C.
Note:
Nathpa Jhakri Hydel plant achieved the highest even power generation of 1191.217 million units of electricity in July 2014.
Recently Updated Pages
Basicity of sulphurous acid and sulphuric acid are

Master Class 10 English: Engaging Questions & Answers for Success

Master Class 10 Social Science: Engaging Questions & Answers for Success

Master Class 10 Computer Science: Engaging Questions & Answers for Success

Class 10 Question and Answer - Your Ultimate Solutions Guide

Master Class 10 General Knowledge: Engaging Questions & Answers for Success

Trending doubts
Who is known as the "Little Master" in Indian cricket history?

A boat goes 24 km upstream and 28 km downstream in class 10 maths CBSE

Who Won 36 Oscar Awards? Record Holder Revealed

Why is there a time difference of about 5 hours between class 10 social science CBSE

Explain the Treaty of Vienna of 1815 class 10 social science CBSE

What is the median of the first 10 natural numbers class 10 maths CBSE