(Manufacturing problem) A manufacturer has three machines I, II and III installed in his factory. Machines I and II are capable of being operated for at most $12$ hours whereas machine III must be operated for at least $5$ hours a day. She produces only two items M and M each requiring the use of all the three machines. The number of hours required the use of all the three machines. The number of hours required for producing $1$ unit of each of M and N on the three machines are given in the following table:
Items I II III M $1$ $2$ $1$ N $2$ $1$ $1.25$
She makes a profit of Rs. $600$ and Rs. $400$ on items M and N respectively. How many of each item should she produce so as to maximise her profit assuming that she can sell all the items that she produced? What will be the maximum profit?
| Items | I | II | III |
| M | $1$ | $2$ | $1$ |
| N | $2$ | $1$ | $1.25$ |
Answer
532.5k+ views
Hint: This is a manufacturing problem where we have to find the maximum profit possible. Here, we use the concept of Linear Programming to maximize profit. We will assume the number of items to be variables and then form equations and plot graphs to find the feasible solution.
Complete answer: Let $x$ and $y$ be the number of items M and N respectively.
Total profit on the production $ = $ Rs. $\left( {600x + 400y} \right)$
Let $Z$ be the profit
Also, the maximum time for operation of machines I and II is $12$ hours and machine III is $5$ hours a day. And the time required on each of the machines I, II and III by items M and N is $1$ , $2$ and $1$ hours and $2$ , $1$ and $1.25$ hours a day respectively.
Thus, the equation formulated as
$Z = 600x + 400y$
Subject to the constraints
$x + 2y \leqslant 12$
$2x + y \leqslant 12$
$x + \dfrac{5}{4}y \geqslant 5$
$x \geqslant 0$
$y \geqslant 0$
Consider a set of rectangular Cartesian axes OXY in the plane.
It is clear that any point which satisfies $x \geqslant 0$ , $y \geqslant 0$ lies in the first quadrant.
Now we draw the graph of $x + 2y = 12$
for $x = 0$ , $2y = 12$ or $y = 6$
for $y = 0$ , $x = 12$
$\therefore $ Line meets OX in A $\left( {12,0} \right)$ and OY in L $\left( {0,6} \right)$
Also we draw the graph of $2x + y = 12$
For $x = 0$ , $y = 12$
For $y = 0$ , $2x = 12$ or $x = 6$
$\therefore $ Line meets OX in B $\left( {6,0} \right)$ and OY in M $\left( {0,12} \right)$
Again we draw the graph of
$x + \dfrac{5}{4}y = 5$
For $x = 0$ , $\dfrac{5}{4}y = 5$ or $y = 4$
For $y = 0$ , $x = 5$
$\therefore $ Line meets OX in C $\left( {5,0} \right)$ and OY in N $\left( {0,4} \right)$
Since feasible regions satisfies all the constraints
$\therefore $ CBDLN is the feasible region
The corner points are C $\left( {5,0} \right)$ , B $\left( {6,0} \right)$ , D $\left( {4,4} \right)$ , L $\left( {0,6} \right)$ , N $\left( {0,4} \right)$
At C $\left( {5,0} \right)$ , $Z = 600 \times 5 + 400 \times 0 = 3000 + 0 = 3000$
At B $\left( {6,0} \right)$ , $Z = 600 \times 6 + 400 \times 0 = 3600 + 0 = 3600$
At D $\left( {4,4} \right)$ , $Z = 600 \times 4 + 400 \times 4 = 2400 + 1600 = 4000$
At L $\left( {0,6} \right)$ , $Z = 600 \times 0 + 400 \times 6 = 0 + 2400 = 2400$
At N $\left( {0,4} \right)$ , $Z = 600 \times 0 + 400 \times 4 = 0 + 1600 = 1600$
$\therefore $ Maximum value $ = 4000$ at $\left( {4,4} \right)$
$\therefore $ The manufacturer has to produce $4$ units of each item to get the maximum profit of Rs. $4000$ .
Note:
Linear programming is a problem solving approach that has been developed to help managers to make decisions. Linear programming is a mathematical technique for determining the optimum allocation of resources and obtaining a particular objective when there are alternative uses of the resources, money, manpower, material, machine and other facilities.
Complete answer: Let $x$ and $y$ be the number of items M and N respectively.
Total profit on the production $ = $ Rs. $\left( {600x + 400y} \right)$
Let $Z$ be the profit
Also, the maximum time for operation of machines I and II is $12$ hours and machine III is $5$ hours a day. And the time required on each of the machines I, II and III by items M and N is $1$ , $2$ and $1$ hours and $2$ , $1$ and $1.25$ hours a day respectively.
Thus, the equation formulated as
$Z = 600x + 400y$
Subject to the constraints
$x + 2y \leqslant 12$
$2x + y \leqslant 12$
$x + \dfrac{5}{4}y \geqslant 5$
$x \geqslant 0$
$y \geqslant 0$
Consider a set of rectangular Cartesian axes OXY in the plane.
It is clear that any point which satisfies $x \geqslant 0$ , $y \geqslant 0$ lies in the first quadrant.
Now we draw the graph of $x + 2y = 12$
for $x = 0$ , $2y = 12$ or $y = 6$
for $y = 0$ , $x = 12$
$\therefore $ Line meets OX in A $\left( {12,0} \right)$ and OY in L $\left( {0,6} \right)$
Also we draw the graph of $2x + y = 12$
For $x = 0$ , $y = 12$
For $y = 0$ , $2x = 12$ or $x = 6$
$\therefore $ Line meets OX in B $\left( {6,0} \right)$ and OY in M $\left( {0,12} \right)$
Again we draw the graph of
$x + \dfrac{5}{4}y = 5$
For $x = 0$ , $\dfrac{5}{4}y = 5$ or $y = 4$
For $y = 0$ , $x = 5$
$\therefore $ Line meets OX in C $\left( {5,0} \right)$ and OY in N $\left( {0,4} \right)$
Since feasible regions satisfies all the constraints
$\therefore $ CBDLN is the feasible region
The corner points are C $\left( {5,0} \right)$ , B $\left( {6,0} \right)$ , D $\left( {4,4} \right)$ , L $\left( {0,6} \right)$ , N $\left( {0,4} \right)$
At C $\left( {5,0} \right)$ , $Z = 600 \times 5 + 400 \times 0 = 3000 + 0 = 3000$
At B $\left( {6,0} \right)$ , $Z = 600 \times 6 + 400 \times 0 = 3600 + 0 = 3600$
At D $\left( {4,4} \right)$ , $Z = 600 \times 4 + 400 \times 4 = 2400 + 1600 = 4000$
At L $\left( {0,6} \right)$ , $Z = 600 \times 0 + 400 \times 6 = 0 + 2400 = 2400$
At N $\left( {0,4} \right)$ , $Z = 600 \times 0 + 400 \times 4 = 0 + 1600 = 1600$
$\therefore $ Maximum value $ = 4000$ at $\left( {4,4} \right)$
$\therefore $ The manufacturer has to produce $4$ units of each item to get the maximum profit of Rs. $4000$ .
Note:
Linear programming is a problem solving approach that has been developed to help managers to make decisions. Linear programming is a mathematical technique for determining the optimum allocation of resources and obtaining a particular objective when there are alternative uses of the resources, money, manpower, material, machine and other facilities.
Recently Updated Pages
Three beakers labelled as A B and C each containing 25 mL of water were taken A small amount of NaOH anhydrous CuSO4 and NaCl were added to the beakers A B and C respectively It was observed that there was an increase in the temperature of the solutions contained in beakers A and B whereas in case of beaker C the temperature of the solution falls Which one of the following statements isarecorrect i In beakers A and B exothermic process has occurred ii In beakers A and B endothermic process has occurred iii In beaker C exothermic process has occurred iv In beaker C endothermic process has occurred

Master Class 11 Social Science: Engaging Questions & Answers for Success

Master Class 11 Physics: Engaging Questions & Answers for Success

Master Class 11 Maths: Engaging Questions & Answers for Success

Master Class 11 Economics: Engaging Questions & Answers for Success

Master Class 11 Computer Science: Engaging Questions & Answers for Success

Trending doubts
One Metric ton is equal to kg A 10000 B 1000 C 100 class 11 physics CBSE

There are 720 permutations of the digits 1 2 3 4 5 class 11 maths CBSE

State and prove Bernoullis theorem class 11 physics CBSE

Draw a diagram of a plant cell and label at least eight class 11 biology CBSE

Difference Between Prokaryotic Cells and Eukaryotic Cells

1 Quintal is equal to a 110 kg b 10 kg c 100kg d 1000 class 11 physics CBSE